Why do I underestimate how long getting ready takes?

By Can't Be Late · · Editorial policy

You might be estimating the morning when everything is laid out and the bathroom is free. For your next estimate, choose a similar morning and count the whole interval from putting down your current activity to stepping outside.

Choose a finish line you can observe

Packing a bag ends when the bag is zipped with everything inside. Getting out of the house ends when the door closes behind you. Write down which one you mean before you guess. Otherwise a perfectly accurate estimate for packing can still leave you late for the bus.

A three-morning record
MorningGuess → elapsed
Tuesday, clothes laid out10 → 14 min
Wednesday, usual routine10 → 18 min
Thursday, shared bathroom12 → 23 min

Keep the interruptions in the record

Before starting, write your estimate. Afterwards, record the elapsed minutes and one fact that affected them. A shared bathroom or a missing water bottle can be a regular part of that morning, even if the details change. Keep observations from comparable days together.

In the example below, the middle observation is 18 minutes. Try that as a starting point for a similar morning. A tight connection might call for more room. Three mornings give you a starting estimate, with plenty of uncertainty.

Read your numbers without losing the difficult day

The three guesses in the table missed by four, eight and eleven minutes. All three point in the same direction, even though the guesses themselves changed. Keep the sign of each difference if you want to know whether you run long. To check accuracy, ignore the sign and compare the size of the misses. A six-minute underestimate and a six-minute overestimate average to zero signed error while both still miss by six minutes.

If the 23-minute morning involved a bathroom queue that only happens on school days, use a school-day estimate for that situation. The 18-minute middle observation describes this small set. It cannot tell you the odds of making tomorrow’s bus.

Sources and assumptions

In studies of academic and everyday tasks, participants often forecast optimistic completion times. In one experiment, explicitly connecting a past experience to the current forecast reduced that bias. The morning record here is our practical adaptation. Buehler, Griffin & Ross (1994), Exploring the planning fallacy.

Wiese and colleagues found that building a plan backward could shift completion forecasts later. A deadline forecast is different from measuring the minutes an individual task takes. Wiese, Buehler & Griffin (2016), Backward planning.

Try it for your next departure

Build a routine from your measured times or track your estimates across seven days.

If you already have a preparation plan and want a reminder for the travel leg, see Can't Be Late for iPhone.