Seven-day punctuality experiment
Measure familiar tasks and compare planned and actual departures. Build a private seven-day record on this device.
Pick one recurring trip and one task you often have to guess. On seven travel days, write your estimate before starting. Afterward, enter what happened. Use the same task name each day to compare like with like.
0 of 7 days observedYour personal report
Enter an actual duration or checkpoint and save the day to see your first comparison. Three observations of the same task unlock a measured suggestion in the departure planner.
Privacy, export and delete
The JSON export includes your task names and exact checkpoint times. Store the file somewhere private. Clearing the experiment removes the observations used for future planner suggestions. Previously saved planner routines and downloaded files can be deleted separately.
How the comparison works
Each named task contributes one estimate and one actual per date. The largest estimation error uses mean absolute differences, so early and late guesses cannot cancel out. After three matching dates we suggest the middle observed duration, rounded up to a whole minute. A long interruption stays visible in the range. Timers round partial minutes up. Blank checkpoints are excluded from their own comparisons.
Connecting an estimate to comparable past experiences was examined by Buehler, Griffin and Ross in studies of project completion. This seven-day format is a practical exercise designed for this site. Original planning fallacy research · NIST guide to means and medians
Worked example
If packing took 8, 15 and 10 minutes, the middle observation is 10 minutes. Keep the 15-minute trip in view when planning a tighter morning.